Cardinal Newman High School

Client:     Diocese of Palm Beach, Cardinal Newman High School

Project Contact:  Gerry Arsenault,  CNHS Advisory Committee Chairman
(561) 655-3113, gaarealty@aol.com

Project Size:     34 Acres

Project Cost:    Phase I. $3.2 million  

Project Description:  The project addresses the need to renovate the 1960’s campus as well as plan for future growth.  Included in the proposal are renovation of the three central existing building structures on campus: two classroom buildings and student cafeteria / gymnasium building. Improvements to the infrastructure include:  a new chiller plant and main electrical vault that will serve the entire campus and upgrading existing athletic fields and parking lots, as well as general enhancement of landscape and drainage throughout the facilities.  New additions to the campus will include an 80 seat chapel, alumni/media center wing, elevated breezeway connection between the classroom buildings, performing arts center and music hall buildings, and a new athletic center building.

 

 

Contact Us

300 Clematis Street, 3rd Floor
West Palm Beach, FL 33401
P: (561) 659-2383
F: (561) 659-5546