The project consisted of providing services for the design through construction of three (3) new dock-master structures, the Brazilian Avenue Dock (North), the Austrian Avenue Dock (Center) and the Peruvian Avenue Dock (South), totaling approximately 2,300 SF, for marina dock and dock-master use, that replaced the prior obsolete structures at the Town of Palm Beach Docks.
Client: Baird Engineering/Town of Palm Beach
Type: Civic, Planning
Cost: 1M
Project Size: 2,300 SF
Year: 2022
The project consisted of providing services for the design through construction of three (3) new dock-master structures, the Brazilian Avenue Dock (North), the Austrian Avenue Dock (Center) and the Peruvian Avenue Dock (South), totaling approximately 2,300 SF, for marina dock and dock-master use, that replaced the prior obsolete structures at the Town of Palm Beach Docks.