Construction of historic façade that was previously converted to modern in the 1950s. The goal of this project was to bring the façade of this 1922 building back to the character of its original appearance which consisted of the removal of the existing concrete panels at the front façade and demolition. Work included assessment of the current condition in conjunction with information from original drawings, photographs, and architectural and engineering documents.
Type: Historic, Civic, Retail
Cost: 2.5M
Project Size: 22,000 SF
Year: 2019
Construction of historic façade that was previously converted to modern in the 1950s. The goal of this project was to bring the façade of this 1922 building back to the character of its original appearance which consisted of the removal of the existing concrete panels at the front façade and demolition. Work included assessment of the current condition in conjunction with information from original drawings, photographs, and architectural and engineering documents.
Type: Historic, Civic, Retail
Cost: 2.5M
Project Size: 22,000 SF
Year: 2019